USAutomatic PATRIOT High Quality Low Voltage Vehicular Swing Gate Operator Solar or AC Charged PATRIOT I Single Swing Gate Operator PA
8STEP 1 Prepare Actuator for Installation Assemble the actuator to the gate bracket as shown in figure 3A STEP
9STEP 3 Mounting of Gate Bracket (PULL to Open Only) Clamp the gate bracket to the gate at the previously determined point and weld to gate. Be sure
10Splicing For Actuator Cable PATRIOT I Single Gate Wiring (only if required) PATRIOT II Dual Gate Wiring (Splice Required for Slave
11STEP 6 Installation of Charging Source SOLAR PANEL Locate and mount the solar panel bracket so that the panel faces southwest and mai
12STEP 9 Making Final Adjustments In order to make final adjustments, a signal device such as a radio control should be used. The control board
13LIMIT SWITCHES The limit switch adjustments are located on the bottom of the actuator. Remove the dust plug to make adjustments. Th
14Circuit Board Terminal Description For Accessories Patriot Control Board TERMINAL DESCRIPTION 1 + 12 volt dc Output. *M
15DS1 Programming Switches Factory settings are shown in bold italic type 1 Automatic Close Timer Enable (Not recommended unless
16DS2 Programming Switches Factory settings are shown in bold italic type 1 Solenoid lock enable / Gate in operation indicator ON
17SAFETY SECTION USAutomatic gate operators are certified to UL325 Vehicular Class I and Class II swing gate standards. UL325 identifies f
18WARNING: TO REDUCE THE RISK OF INJURY OR DEATH 1. READ AND FOLLOW ALL INSTRUCTIONS 2. Never let children operate or play with gate controls. Ke
19SAFETY SECTION Remedies for Safety Concerns Zone 1 Safety edges and photo electric eyes are the most common types of pro
20SAFETY SECTION Remedies for Safety Concerns Zone 3 Safety edges are the best protection. A photo eye may also be used. For vehi
21Periodic Service All gate operators require periodic checking and adjustments by a qualified technician of the control mechanism for force (load),
22TROUBLESHOOTING SECTION OUTLINE 1 Single gate will not operate. 2 Dual gate will not operate. 3 Single or Dual gate opens or closes very slow.
231. My single gate will not operate Patriot I: STEP 1 Remove control box cover locate the “Open/Close Command” push button and press it to operat
24NOTE: The USAutomatic multi stage charger does not output any voltage or current when disconnected from the battery, you cannot check charger by d
25 7. Dual Gate opens or closes correctly then immediately reverses direction: STEP 1 This is most likely caused by an incorrect limit switch adju
2610 Photo-eye, safety loop or other safety accessory will not reverse the gate when closing or hold the gate open STEP 1 The first thing to chec
27Accessory Wiring Information USAutomatic Patriot gate operators are 12 vdc powered, solar charged operators do not require 110 vac for proper oper
1INTRODUCTION This operator is intended to be installed on vehicular Class I or Class II gates as defined by UL 325. Maximum gate load not to excee
28Accessory Wiring Before wiring accessories to the Patriot control board remove the actuator connector plug from the control board, this will disco
29Accessory Wiring The +12 volt dc output is protected with a 1.5 amp auto-resetting fuse. Solenoid Lock – This is a +12 volt dc output that can out
30Loops Loop Position Diagram Single Swing Gate with 2 Loops Dual Swing Gate with 2 Loops
31Loops Typical Loop Saw cut Proper wiring of two loops performing the same function. Example: Inside and Outsid
32Loops Loop Size Chart The loop size is based on the width of the driveway. If the driveway is 14' wide, the loop would be a 6'x6'
USAutomatic PATRIOT I PATRIOT II Limited 5 Year Warranty The PATRIOT Gate Operator is warranted to be free of defects in materials or workmansh
2Table Of Contents Page Introduction...1 Table of Contents...
3GENERAL REQUIREMENTS General hand/tools such as combination wrenches, tape measure, level, clamps, etc. are required. Your particular installation
4IMPORTANCE OF A PROPERLY DESIGNED GATE As a general rule a gate, which is to be automatically operated must be stronger and smoother than one, w
5 PARTS INCLUDED Cabinet with Control Board and Receiver OR
6STEP 1 Hinge Mount Tube Installation (Part 1) PULL TO OPEN / TOP VIEW (SEE BOTTOM OF PAGE FOR PUSH TO OPEN) (Left-handed installation show
7STEP 1 Hinge Mount Tube Installation (Part 3) VERTICAL HEIGHT POSITIONING Refer to figures 2B-2F to determine the best location for the actu
Komentarze do niniejszej Instrukcji